Industrial Electrical Overhaul — Wynberg Manufacturing Facility
Back to Projects industrial

Industrial Electrical Overhaul — Wynberg Manufacturing Facility

Project Overview

A 5,000m² manufacturing facility in Wynberg required a complete electrical infrastructure upgrade to support new production machinery and meet current safety standards. The existing installation was outdated, under capacity, and non-compliant with current regulations.

Our Solution

We performed a full electrical redesign and installation, including a new 630A three-phase main distribution board, six sub-distribution boards, dedicated supplies for each production line, and a complete emergency lighting and fire detection system.

Key Components

  • 630A three-phase main distribution board
  • 6x sub-distribution boards
  • Dedicated machine supply points
  • Emergency stop system
  • Emergency lighting installation
  • Fire detection and alarm integration
  • Earth leakage and surge protection

The Result

The facility now has a safe, compliant, and future-proof electrical installation that supports current production needs with capacity for future expansion. Downtime was carefully managed around the production schedule, with all critical work completed during planned shutdowns.

Project Details

Client
Precision Manufacturing (Pty) Ltd
Location
Wynberg, Johannesburg
Category
industrial
Completed
July 2024

Tags

industrialthree-phasemanufacturingdistribution board