Complete Solar Backup Installation — Bryanston Family Home
Back to Projects residential

Complete Solar Backup Installation — Bryanston Family Home

Project Overview

This Bryanston family home needed a reliable solution to combat persistent load shedding without compromising on modern living. The homeowners wanted a system that would keep essential circuits — lights, internet, security, fridges, and entertainment — running seamlessly during outages, with the potential to expand in future.

Our Solution

We designed and installed an 8kW hybrid inverter system paired with a 10kWh lithium-ion battery bank. The system automatically switches to battery power within milliseconds of a grid failure, providing uninterrupted power to the designated essential circuits.

Key Components

  • 8kW Deye hybrid inverter
  • 10kWh Dyness lithium battery
  • 6x 550W JA Solar panels
  • Automated changeover with zero transfer time
  • Remote monitoring via smartphone app

The Result

The family now enjoys uninterrupted power during load shedding, with the solar panels offsetting a significant portion of their daytime electricity consumption. The system was installed in three days with minimal disruption to the household.

“The installation team was punctual, tidy, and clearly knew their craft. We’ve had no issues and our lights stay on during load shedding.” — David van der Merwe

Project Details

Client
Van der Merwe Family
Location
Bryanston, Johannesburg
Category
residential
Completed
November 2024

Tags

solarbackupresidentialhybrid inverter

Need Similar Work?

Contact us to discuss your electrical project.

Get a Quote

Project Gallery

Related Projects